Altimexor Metal Altimexor Metal

Construction Steel A36/Ss400/S235jr/S275jrs355jr/Q235 Q355 Hot Rolled H Beam

Still deciding? Get samples of $ !
Request Sample

Product Description

Overview
Construction Steel H Beam
Certification ISO, RoHS, ABS
Production 80000 tons Per Month
MOQ 25 tons
Usage Foundation Pile
Transport Package Standard Shipping Packaging or Customized
Specification Height (H) × Width (B) × Web Thickness (T1) × Flange Thickness (T2)
Trademark Rizhao steel, Laisteel, Jinxi steel
Origin China
Specification
Certification ISO SGS
Usage Foundation pile
Material Q235B, SS400, A36, Q345B
Application Construction, Bridges, and other engineering projects
Packing & Delivery
Packing Details 1 Packing Details 2
Company Profile
  • Corporate Strength: Both Scale and Distribution
    Production Base: Equipped with a modern production park covering an area of over 10,000 square meters, boasting multiple sets of internationally advanced production units. The park encompasses a full range of production lines for seamless steel pipes, welded pipes, stainless steel pipes, and more. Annual production capacity reaches 20,000 tons.
  • Core Products: Covering All Scenarios
    Products strictly adhere to international and domestic standards such as ASTM, GB, and ISO.
  • Product Series:
    - Seamless steel pipe series: Carbon steel, alloy, and stainless steel (φ10mm to φ630mm).
    - Welded steel pipe series: Spiral and straight seam welded pipes (φ219mm to φ3000mm), suitable for oil, gas, and municipal water supply.
Production Facility
FAQ
1. Can samples be provided? What are the sample costs and delivery periods? We can offer free samples. The sample preparation period is 3-5 working days. Delivery time via international courier (DHL/UPS/FedEx) is approximately 3-7 working days. Tracking numbers will be provided.
2. Can customized orders be accepted? Customized production is supported. Product specifications (non-standard sizes, tolerances), surface treatments (acid washing, painting, galvanizing), and packaging methods can be adjusted based on drawings. The production cycle typically extends by 5-10 working days for custom orders.
3. What is the packaging method? Is it moisture-proof? Packaging follows international shipping standards: waterproof plastic film for the inner layer and high-strength steel straps for the outer layer. Wooden pallets (fumigation treated per ISPM 15) can be added upon request.
4. What is the product warranty period? The warranty for regular steel products is 36 months from the date of receipt. This covers material non-compliance and surface rust under normal conditions. Free technical support is provided during this period.
5. What is the standard lead time for bulk orders? For standard stock items, the lead time is usually 7-15 days. For large-scale production or specific steel grades, it typically ranges from 20-30 working days depending on the quantity and current production schedule.
6. Do you support third-party quality inspections? Yes, we fully support third-party inspections such as SGS, BV, or TUV to ensure the quality and specifications meet your project requirements before shipment.

Related Products