Altimexor Metal Altimexor Metal

Durable Prepainted Steel Coils Sourced Directly From China

Customization: Available
After-sales Service: Quality Problem Can Send Free New
Warranty: 20year

Product Description

Basic Specifications

Model NO.PPGI 004
StandardASTM, JIS, GB, AISI, DIN, BS
Surface TreatmentCoated
TechniqueCold Rolled
ApplicationContainer Plate
Thickness0.12-3.0 mm
Width600-1500 mm
Coating30-275g
MaterialDx51d S350gd
Coil ID508mm/610mm
Capacity300,000 Ton/Month
OriginChina

Product Description

PPGI: JIS G3303, GB/T 12754-1991; PPGL: ASTM A755/M, JIS G3322

StandardPPGI: JIS G3303, GB/T 12754-1991; PPGL: ASTM A755/M, JIS G3322
MaterialDX51D, DX52D, S350GD, S550GD
Thickness0.12-3.0 mm
Width20-1500 mm, Normal width is 914/1000/1219/1250/1500 mm
Coating ProcessFront: double coated & double drying; Back: double coated & double drying; single coated & double drying;
Coating TypesTop paint: PVDF, HDP, SMP, PE, PU; Primer paint: Polyurethane, Epoxy, PE; Back paint: epoxy, modified polyester
Coil ID/WeightID: 508 mm/610 mm; Weight: 3-12 tons
CertificateISO9001:2008
ShipmentWithin 10-15 workdays; 25-30 days when quantity exceeds 1000 tons.

Frequently Asked Questions

What standards do your PPGI and PPGL coils comply with?
Our products comply with international standards including JIS G3303, GB/T 12754-1991 for PPGI, and ASTM A755/M, JIS G3322 for PPGL.
What is the thickness and width range available?
We offer a thickness range from 0.12 mm to 3.0 mm and widths from 20 mm to 1500 mm, with standard widths available at 914, 1000, 1219, 1250, and 1500 mm.
What types of coatings can be applied to the steel coils?
We use various top paints such as PVDF, HDP, SMP, PE, and PU. Primer options include Polyurethane, Epoxy, and PE, while back paints are typically epoxy or modified polyester.
What is your monthly production capacity?
Our facility has a robust production capacity of approximately 300,000 tons per month.
How long is the typical delivery lead time?
Orders are usually processed within 10-15 workdays. For large orders exceeding 1000 tons, the delivery time is approximately 25-30 days.
What are the available base materials?
The base materials used include DX51D, DX52D, S350GD, and S550GD to ensure durability and strength.

Related Products